Photos from the job
This Temecula slab leak water damage project shows the full path from moisture documentation and dry-out planning into packout, reconstruction, and pack-back. The slab leak affected finished flooring, wall and baseboard areas, bathroom and shower finishes, and room transitions, so the repair had to be handled as one connected restoration path instead of a quick patch.
Project overview
2 photosDocumentation
8 photosPackout
10 photos
Mitigation
12 photos
Reconstruction
40 photos
Damage documentation
19 photos
Pack-back and finished condition
50 photos