More photos from this job
Additional job photos show the conditions, documentation, repair details, and progress photos connected to this project.
Project summary
What Happened: An upstairs angle stop failed, sending water cascading through the second-floor bathroom. The water traveled down through the ceiling, extensively damaging multiple rooms on both floors.
Work performed
- Situation: What Happened: An upstairs angle stop failed, sending water cascading through the second-floor bathroom.
- What Happened: An upstairs angle stop failed, sending water cascading through the second-floor bathroom. The water traveled down through the ceiling, extensively damaging multiple rooms on both floors.
- Water Damage project completed by PL Builders in Winchester.